Company Profile
For more than 19 years, Mig-Plus has been providing a range of services, from obtaining technical conditions to operating gas supply and gas consumption facilities.
To date, we have built and maintained more than 150 heat and gas supply facilities, with a total heat capacity of more than 300 mW. Our company has 48 employees. We work in Moscow and the southern direction of the Moscow region, in the Tula, Kaluga, Yaroslavl, Bryansk, Tver, Nizhny Novgorod, Ryazan regions.Mig-Plus has extensive experience, its production base and high-quality specialists to organize and carry out a complex of works from design to operational.
In our work, we are guided by standards aimed at reducing time, material costs by our customers.
The main customers of the company during this time are:
For qualified work, the organization’s specialists periodically undergo training on the basis of training classes of suppliers firms, in Russia, Italy and Germany.
A high level of technical training allows us to provide qualified after-sales service for the constructed facilities. Currently, more than 100 objects are in service in Moscow, Ryazan, Domodedovo, Podolsky, Chekhov and Serpukhov districts.
-
1997
- Setting up of Mig-Plus Company..
2004
- Head office commissioning.
2006
- Obtaining accreditation from Mosoblgaz. Joining the Association of Gas Builders of Moscow Region.
2009
- Opening of its design office. -
2010
- Obtaining the national certificate "Leader of the Economy of the Russian Federation."
2011
- Start the operation of the production base.
2012
- 100 enterprises with regular services.
2014
- Participation in the national socio-economic project of Russia "Elite of the Nation" -
Big Gold Medal "Business Elite",
National certificate "Socially responsible enterprise of the Russian Federation."
Since 1997, the construction of the following facilities has been completed:
-
JSC "Serpukhovkhleb"Замена трех паровых котлов Е-1/9Г (750 кВт) общей
мощностью 2,25 МВт
- на два паровых котла КПА-700 (476 кВт)
- три водогрейных котла
Alfatherm Alfa E510 (510 кВт) общей мощностью 2,482 МВт
Срок реализации 3 мес -
DSK "AUTOBAN" boiler house 350 kWМонтаж блочно-модульной котельной мощностью 350КВт на базе котлов «Viessmann» ,с горелками «Weishaupt»
Монтаж дымовой трубы высотой 10 метров -
Shopping Center "LETO"Индивидуальный тепловой пункт 3,5 МВт
-
LLC SZ TEHPLAST 1MW boiler houseLLC "SZ TECHPLAST"
The main area of activity is the production of PVC, HDPE and Polypropylene pipes.
- Installation of a 1 MW boiler house based on Polykraft boilers and a Thermona domestic boiler
-
LLC "SiPiSi Impex" hot water boiler house 6MW
ООО «УК «Си-Пи-Си»Основной областью деятельности является производство, фасовка и упаковка пищевых и непищевых продуктов.- Монтаж 1-й очереди котельной мощностью 6МВт на базе котлов "Polykraft", с горелками "Polykraft"
- Монтаж дымовой трубы высотой 16 метров
-
DSK "AUTOBAN" boiler house 500 kWJSC "DSK" AUTOBAN "Chekhov branch.
The main area of activity is road construction -
Sacmi Ceramic Plumbing Drying and Roasting Processing LineООО "Витра-Сантехника"
Турецкая компания по производству сантехфаянса -
LLC “Yurga + 1” boiler house with a capacity of 3.2 MWООО «Юрга+1»
Производство оконных конструкций -
Steam boiler house with a total capacity of 10 tons / steam / hourLLC "Russian field"
Production and sale of ingredients for the confectionery industry- Steam boiler house with Viessmann boilers and Weishaupt burners with a total capacity of 10 t steam / hour
-
Multi-storey residential building (MO) 1.2 MWMulti-storey residential building
-
INSTALLATION OF A BUDERUS BOILER WITH A POWER OF 350 KWLLC Decor (Europlast)
Production and sale of products from polyurethane foams- Installation of a 350 kW Buderus boiler with a Riello burner for hot water supply. Reconstruction of the internal gas pipeline and commercial gas metering unit.Installation of a reserve fuel economy with an underground tank of 10 m3Installation of a heating network for a production line
-
LLC "Proplastic" boiler house with a capacity of 7 MWLLC "Proplastic"
Company for the production of polyethylene products -
City boiler hohuse (MO) with a capacity of 21 MWBoiler station in town Obolensk
-
Park-Hotel Drakino 3.2 MW boiler houseПарк-Отель "Дракино"
Кислородный курорт и СПА-центр -
Air heating based on Apen Group Air Heaters with a total capacity of 1 MWОАО «Дашковка»
Производство сельскохозяйственной продукции, выращивание овощей и картофеля в открытом грунте, производство молока, творога, сметаны. -
Shopping Center "B-Class"Block boiler house based on 2 water-heating boilers "ZioCab" -1000 with gas burners "RIELLO"
-
Shopping Center “Korston”Блочная котельная на базе 2-х водогрейных котлов «ЗиоCаб»-1000 с газовыми горелками «RIELLO»
-
"Chekhov Lada" reconstruction of the boiler houseCтроительство котельной, работающей на отработанном масле и дизельном топливе
-
“Serpukhov Mercedes”Construction of a waste oil and diesel boiler
-
Carnival Shopping Center 5 MWТорговый центр Карнавал
Торгово-развлекательный центр -
LLC Vitra-Plumbing boiler house with a capacity of 7 MWООО "Витра-Сантехника"
Турецкая компания по производству сантехфаянса